To allow for shoreline maintenance, a temporary, nonemergency 5 foot drawdown of Claytor Lake has been proposed for Saturday, Nov. 6 through Sunday, Nov. 14.
According to the plan submitted to FERC, the lake will be drawn down starting Wed. Nov. 3 at 1.6 ft a day until it reaches 5 feet down by 9 a.m. Sat Nov. 6. It is to remain at 5 feet down until 10 p.m. Sun Nov. 14 when the lake will be allowed to start refilling.
Targeted return to normal elevation is 10 p.m. Friday, Nov. 19, depending on inflow.
Please visit the “Lake Information” page to record your total mussel salvage numbers!
To allow for shoreline maintenance, a temporary, nonemergency 5 foot drawdown of Claytor Lake has been proposed for Saturday, Nov. 6 through Sunday, Nov. 14.
According to the plan submitted to FERC, the lake will be drawn down starting Wed. Nov. 3 at 1.6 ft a day until it reaches 5 feet down by 9 a.m. Sat Nov. 6. It is to remain at 5 feet down until 10 p.m. Sun Nov. 14 when the lake will be allowed to start refilling.
Targeted return to normal elevation is 10 p.m. Friday, Nov. 19, depending on inflow.
Please visit the “Lake Information” page to record your total mussel salvage numbers!
Details
Venue
Dublin, VA 24084 United States + Google Map